HOME
SAFETY
HEALTH
ENVIRONMENT
FIRE
EMERGENCY PLAN
SECURITY
MOTOR FLEET
MAINTENANCE

PERFORMANCE 99.3%
AVERAGE LTIFR
0.00
TOTAL VISITS: 12,670
VIEWERS ONLINE: 18

?

Performance Criteria

  • Monthly Inspection: 1 Point — inspection done before month end.
  • Annual Service: 1 Point — service within due date.
  • Pressure Test: 1 Point — pressure test within due date.
  • RIT Report: 1 Point — PDF uploaded (only scored if RIT is set as applicable).
  • Photo: 1 Point — photo uploaded.

Inspection Light

  • 🟢 Green — inspected this month
  • ⚪ White — inspected last month, not yet this month
  • 🔴 Red — not inspected last month or this month

Fault Light

  • ⚪ White — not inspected this month
  • 🔴 Red — faults, none repaired
  • 🟠 Orange — faults, some repaired
  • 🟢 Green — no faults, or all repaired
COMPLIANCE
100% (15/15)
Show:

FIRE SUPPRESSION SYSTEM — FSS (3 Units)

Map Insp Fault Type Size Location RIT Service Date Pressure Test Photo Action
📍 FSS1
FSS1 Report
Due: Feb 2027
Due: Aug 2031
View
📍 FSS2
FSS2 Report
Due: Feb 2027
Due: Feb 2040
View
📍 FSS3
FSS3 Report
Due: Feb 2027
Due: Feb 2040
View