Performance Criteria
- Monthly Inspection: 1 Point for this month's inspection done.
- Internal Inspection: 1 Point while the internal inspection is not overdue.
- Photo Uploaded: 1 Point for a photo uploaded.
- Report Uploaded: 1 Point for the commissioning / 10-year internal inspection PDF uploaded.
Inspection Light
- π’ Green β inspected this month
- βͺ White β inspected last month, not yet this month
- π΄ Red β not inspected last month or this month
Fault Light
- βͺ White β not inspected this month
- π΄ Red β faults, none repaired
- π Orange β faults, some repaired
- π’ Green β no faults, or all repaired
COMPLIANCE:
100% (8/8)
Show:
Internal Inspection Frequency:
SPRINKLER WATER RESERVOIR β SR (2 Units)
| Map | Inspection | Fault | Type/Category | Size (Ltr) | Location | Photo | Report | Internal Inspection | Action |
|---|---|---|---|---|---|---|---|---|---|
| π SR2 | SR2 | View | Report |
Due: Feb 2036
|
|
